The grout installation is on the contractor. Anyone have an idea how long epoxy grout needs to set before grinding? I know product as this link shows 7-14 days for full cure:
Not sure if this is correct, I've seen a job like this once and ask a tile installer... if it was to be fixed how would you go about it."He said he would remove at least half the sanded grout and fill it with unsanded grout mixed with latex instead of water. He thought that would strengthen the grout enough to hold in place".I think Fred has the best answer, But I've heard epoxy grout install is pretty challenging.Good luckOn Jul 9, 2012, at 9:14 AM, Eric - DGG wrote:Rescuing a bad tile job for a contractor. Marble tile with quarter inch sanded grout lines. He's willing to pull out the existing grout, but the question is, what should go back in? Unsanded won't hold up that wide.I forget the reason, not financial, but starting over is not an option.Powered by http://DiscussThis.com
Visit list archives, subscribe, unsubscribe or change your subscription preferences
Start a new conversation (thread)
Powered by http://DiscussThis.com
Visit list archives, subscribe, unsubscribe or change your subscription preferences
Start a new conversation (thread)