If the liquid is latex mix to like pancake batter. We usually float the floor after 200 resin. Give at least 12 hrs set time. 

Best Regards,
Randy Frye, CEI Surface Pros
www.ceisurfacepros.com
239-253-1991

On Jul 18, 2014, at 8:51 AM, Baird Standish <bairdstandish@gmail.com> wrote:

Hello partners. We are working on the restoration of a travertine floor. I recently purchased a gallon kit of Bonstone Traverfill, which is a two part material involving both powder and liquid. I tried to find the recent thread where this was discussed, but for some reason I cannot find it.  The instructions are fairly vague.  They suggest either a mixture of 1 .5 liquid to 5 parts powder by weight, or 2 parts liquid to 7 parts powder by weight.  There has to be a better way to gauge the mixture. 

Also, they do not suggest a curing time. 

We have cut the floor to 100 grit and my plan is to test some of the areas. Am I on track if I fill after 100, cut the floor with 200 and then continue honing or polishing as necessary?  How long do I have to let this stuff dry?
Thanks
Baird



--

________________________________________
From the desk of
Baird Standish
Managing Partner
Facility Specialists, LLC
15 West Highland Ave.
Suite E
Philadelphia, PA 19118
Phone: 215-732-7505
Fax: 215-546-9160
www.facspecs.com

 
Visit list archives, subscribe, unsubscribe or change your subscription 
preferences:
http://stoneandtilepros.simplelists.com/sccpartners
 
Start a new conversation (thread): 
sccpartners@stoneandtilepros.simplelists.com